[1]成忠蔚.工程项目施工风险管理的分析及对策[J].现代农业研究,2019,(7):116-118.
 Cheng Zhongwei.Analysis and Countermeasures of Construction risk Management of Engineering projects[J].Modern Agricultural Research,2019,(7):116-118.
点击复制

工程项目施工风险管理的分析及对策
分享到:

《现代农业研究》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2019年7期
页码:
116-118
栏目:
推广与实践
出版日期:
2019-06-14

文章信息/Info

Title:
Analysis and Countermeasures of Construction risk Management of Engineering projects
作者:
成忠蔚
江西财经大学330013
Author(s):
Cheng Zhongwei
Jiangxi University of Finance and Economics 330013
关键词:
工程项目风险对策
Keywords:
engineering projects risks countermeasures
摘要:
随着我国经济持续稳健的发展与城市化进程的不断加快,建筑行业也迎来了新的发展 机遇。在大型工程项目施工建设过程中,由于未来充满着不确定因素和激烈的竞争,不可避免 的带来了各种风险,工程项目施工的复杂性、个性化和较长的生产周期也增加了项目施工的不 确定性。因此,工程项目施工风险管理成了提高项目施工成功率的关键因素,在整个开发系统 范围受到普遍重视。作为工程项目管理之一的风险管理是建筑企业获取最大经济效益和社会 效益的重要因素之一。这决定了建筑企业在做好投资控制、进度控制、安全生产、质量控制、文 明施工的同时,
Abstract:
With the sustained and steady development of economy and the acceleration of urbanization in China, the construction industry has also ushered in new development opportunities. In the construc? tion process of large-scale engineering projects, due to the uncertain factors and fierce competition in the future, it inevitably brings all kinds of risks and the complexity of the construction of engineering projects. Individualization and long production cycle also increase the uncertainty of project construc? tion. Therefore, the construction risk management of engineering project has become the key factor to improve the success rate of project construction, and has been paid more and more attention in the whole development system. As one of the engineering project management, risk management is the big? gest economic effect for construction enterprises. One of the important factors of benefit and social bene? fit. This determines that while the construction enterprises do a good job of investment control, progress control, safety production, quality control and civilized construction, they should construct the risk man? agement mechanism of the construction project and strengthen the early warning of the construction risk of the construction project.

参考文献/References:

[1] 王健, 刘尔烈, 骆刚. 工程项目管理中工期—成本—质量综 合均衡优化[J]. 系统工程学报, 2004, 19(2):148-153. [2] 蔚林巍. 项目管理的最新进展[J]. 管理工程学报, 2000, 14 (3):65-69.

相似文献/References:

[1]张小梅.出口企业信用证结算风险识别与防范探析[J].现代农业研究,2017,(10):73.
[2]苗志军.社会资源在水利水电工程项目施工中的利用和管理[J].现代农业研究,2017,(05):75.
[3]姜婷婷.农产品供应链金融的风险防范[J].现代农业研究,2020,(10):15.
[4]王珺.林业气象灾害风险区划方法[J].现代农业研究,2021,(3):100.

更新日期/Last Update: 2019-06-14